1. 350vip浦京集团




      1. CORREN POSITION: HOME1 > NEWS CENTER > Picture News

        Generator of CNTIC Bangladesh Ashuganj Power Plant (East) Project Successfully Located

        Source: Author: Date :2020-03-18【Font:B M S


        At 9:43 am local time on February 24th, the generator of Bangladesh Ashuganj Power Plant (East) Project undertaken by CNTIC was successfully hoisted. With a total weight of 408 tons, the generator is yet the heaviest single equipment in the entire plant.




        1. XML地图