1. 350vip浦京集团




      1. CORREN POSITION: HOME1 > NEWS CENTER > News

        CNTIC Vice President Mr. Zhang Xu Conducted Investigation on Project Site of Baku, Bangladesh 275MW Coal-Fired Power Plant

        Source : Author : Date :2016-12-20【Font:B M S


        On Dec. 17th, invited by the Third Engineering Company of Northeast Electric Power, CNTIC Vice President Mr. Zhang Xu conducted investigation on project site of Baku, Bangladesh 275MW Coal-Fired Power Plant. Later the two parties conducted in-depth exchanges regarding engineering construction management.




        1. XML地图