1. 350vip浦京集团




      1. CORREN POSITION: HOME1 > NEWS CENTER > News

        Overseas Attraction: Water Pressure Test of Waste Heat Boiler in CNTIC Ghorasal Power Station Project Succeeded at a Time

        Source : Author: Date :2017-08-22【Font:B M S



        On the afternoon of Aug. 19th, water pressure test of waste heat boiler in CNTIC Ghorasal Power Station Project succeeded at a time. The realization of the node lays a solid foundation for the smooth progress of combined cycle power generation.




        1. XML地图